Marine Lagging & Insulation | NAVSEA 009-011

Home / Services / Lagging & Insulation

Navy & marine shipboard services

Marine Lagging & Insulation

Green Toes provides shipboard insulation installation and repair, protective lagging, and removable insulation covers for Navy and marine-industry projects. NAVSEA Standard Item 009-011, “Insulation and Lagging; install,” provides the installation requirements when invoked by the project.

Our work

Lagging & Insulation Slideshow

Browse eight shipboard lagging and insulation projects. Use the arrows, thumbnails, or swipe to view each photo.

Systems & applications

Shipboard Insulation & Lagging Systems

Material selection, installation details, and protective finishes depend on the system, space, and contract requirements.

Anti-sweat & refrigeration insulation

Thermal foam insulation for specified cold piping systems to help control condensation.

MIL-PRF-32514; MIL-A-24179 adhesive

Compartment & hull insulation

Thermal and acoustic insulation for designated shipboard compartments.

MIL-STD-769

Duct insulation

Thermal and acoustic insulation around shipboard ventilation ductwork.

MIL-STD-769

Machinery insulation

Insulation and lagging fitted around designated marine machinery.

MIL-STD-769

Piping insulation

Insulation around shipboard piping, bends, and fittings to the specified system requirements.

MIL-STD-769

Protective cloth lagging

Protective glass-cloth finishes over insulation, including specified high-traffic applications.

MIL-C-20079, Type I, Class 6 or 8 where required

Removable & reusable insulation covers

Fitted covers for designated equipment and piping components requiring maintenance access.

NAVSEA 009-011; MIL-STD-769

Specialized insulation systems

Passive fire-protection insulation and other specified systems are selected to the invoking work item.

MIL-STD-769

Specifications & workmanship

NAVSEA 009-011 Insulation & Lagging Services

From pipe insulation to machinery and ventilation spaces, our estimating team can review your insulation and lagging scope, drawings, quantities, access requirements, and schedule. Send the work item so we can identify the applicable materials and installation details.

NAVSEA 009-011 references MIL-STD-769, Insulation Requirements for U.S. Naval Vessels. Surface preparation and painting of new insulation, lagging, and reusable covers also involve NAVSEA 009-032 requirements where specified.

Green Toes supports ship repair projects in San Diego, Puget Sound, and Hampton Roads, with CONUS and OCONUS mobilization available. Looking for flooring work too? Explore our marine decking services.

Technical reference: NAVSEA Standard Items — Item 009-011

The contract-invoked revision, approved materials, and project drawings determine applicability. Specification references describe requirements for the relevant system.

Contact Us

Send your vessel, work location, insulation system, quantities, drawings, and required dates.